Environmental permitting and permit-condition management

Strategy, studies and technical leadership of the process: from choosing the regulatory route to delivering what the permit requires.

On record
144 ARTs · 60 clients · 7 Brazilian states
Studies
RCA/PCA · RAS · studies for EIA/RIMA · PBA
After the permit
Permit conditions · renewal · technical defense

ARTs (technical responsibility records) filed with CREA-MG in the name of the responsible engineer, 2009–2026.

The problem

Permitting rarely stalls on the study. It stalls on the regulatory route, the reply to the agency and the condition nobody owns.

The wrong regulatory route leads to the wrong study. A half-answered information request sends the process back to the end of the line. A permit condition with no owner and no evidence comes back at renewal, as a new requirement or as a notice of violation.

H·MARIZ runs permitting as a sequence of decisions: which regulatory route applies, which studies it requires, who produces them, what the agency will ask and how each obligation will be met and evidenced.

Who it is for

  • Projects being developed, expanded or brought into compliance
  • Operations with a permit to renew or conditions behind schedule
  • Projects with an open agency requirement, opinion or notice of violation
  • Investors who need to know what is still missing to permit an asset

From complexity to plan

The process, structured.

The same project, before and after it is organized: workstreams, dependencies and the points where someone has to decide.

  1. TerritoryProject area
  2. TerritoryConstraints and interfacesDecision: Adjust the design or proceed?
  3. Environmental agencyClassification and permitting trackDecision: Which permitting track?
  4. Environmental agencyTerms of reference
  5. StudiesEnvironmental studies
  6. StudiesVegetation clearing and offsets
  7. Environmental agencyReview and information requestsDecision: How to answer the requests?
  8. ObligationsLicense conditions
  9. ObligationsOwners and deadlines

Conceptual modelConceptual model. The actual sequence depends on the type, size and location of the project and on the competent agency; no step here stands for a license granted.

Evidence

What has been delivered under technical responsibility.

Types of product with an ART on record, by the sector where they were applied. No client names: the list shows what was done, not for whom.

ART · engineer of record
Technical products with an ART on record, 2009–2023
Technical productWhere it was applied
Environmental control report and plan (RCA/PCA)Mining, distribution, waste treatment, rail terminal, land subdivision
Simplified environmental report (RAS)Mining, road paving, residential development
Studies for environmental impact assessment (EIA/RIMA)Water resources: baseline, impacts and water-quality program
Basic environmental plan (PBA)Railway expansion
Responses to agency information requestsRailway, mining, steelmaking
PCA management and monitoring of permit conditionsIndustry, water-use grants, forestry
Vegetation clearing and offsets (forest inventory, PUP, PTRF)Energy, mining, steelmaking, construction
Degraded-area recovery plans (PRAD, PRADA) and monitoringReal estate development, forestry
Mine closure plansNine plans, in two states
Technical support for the defense of a notice of violationMining

Records filed with CREA-MG in the name of the responsible engineer, before H·MARIZ was founded.

H·MARIZ · 2026

By H·MARIZ, in 2026

  • Compliance report for a condition set in a municipal planning opinion, covering oversight of rain-garden maintenance and a functional infiltration test
  • Black-smoke monitoring of a diesel fleet (Ringelmann scale) in response to a municipal environmental agency requirement, with an action plan
  • Solid waste management plans (PGRS)
Deliverable template

Permit-conditions matrix

The structure we use to take a condition out of the permit PDF and put it into the routine. Both rows are sample entries, with no client data.

Permit-conditions matrix
ConditionSourceDeadline or frequencyOwnerEvidence of complianceStatus
Submit the annual effluent self-monitoring reportOperating permit, item 3Yearly, by March 31Operations · contracted laboratoryFiled report and laboratory resultsOn schedule
Carry out the riparian strip restoration projectTechnical opinion, item 7180 days from issueEnvironment team · contractorPhotographic report and execution ARTIn progress

Scope and deliverables

From regulatory screening to the last permit condition.

The whole process, or only the stage that is stuck. Every service ends in a deliverable.

  1. Permitting strategy

    Classification, competent agency, permitting track and sequence of permits.

    Deliverable

    Strategy note: regulatory route, required studies, risks and schedule.

  2. Studies and multidisciplinary coordination

    RCA/PCA, RAS, studies for EIA/RIMA and control plans, with specialists under a single technical lead.

    Deliverable

    Studies ready to file, with technical responsibility on record.

  3. Regulatory risk analysis

    Constraints, activities requiring authorization, offsets and points of institutional conflict, before filing.

    Deliverable

    Regulatory risk matrix: what blocks the project and what can be managed.

  4. Agency information requests

    A close reading of what the agency asked and a technical reply that answers it, on time.

    Deliverable

    A reply ready to file, traceable item by item.

  5. Permit-condition management

    Every condition with an owner, a deadline, a routine and evidence.

    Deliverable

    Permit-conditions matrix and compliance reports.

  6. Regulatory engagement

    Technical dialogue with the environmental agency and with intervening bodies throughout the review.

    Deliverable

    Record of meetings, official letters and follow-ups.

  7. Process monitoring

    Filings, deadlines and case movements followed through to the decision; the technical basis for the defense when a violation is issued.

    Deliverable

    Process status report.

How the work is organized

How we run a permitting process.

  1. 01

    Understand

    The project, the site and the history of the process: what has been filed, requested and promised.

  2. 02

    Structure

    The regulatory route and the studies it requires, with assumptions and exclusions in writing.

  3. 03

    Deliver

    Studies, filing, replies and technical dialogue with the agency during the review.

  4. 04

    Manage

    Conditions and deadlines under control, with evidence ready for renewal.

Proven experience

From the first study to the technical defense.

  • ART · engineer of record

    Technical responsibility on record since 2009: 144 ARTs, for 60 clients, in seven Brazilian states.

  • Executive experience

    Environmental permitting and regulatory strategy for large-scale linear infrastructure.

  • H·MARIZ · 2026

    Reports on compliance with permit conditions and on municipal agency requirements, delivered in 2026.

Experience from 2009 to 2023 belongs to the responsible engineer and is recorded in ARTs (technical responsibility records) filed with CREA-MG; the 2026 work was contracted by H·MARIZ. Clients are not named. The list of ARTs is available on request.

Next

Related portfolio and capabilities.

Related portfolio

  • Mining

    Environmental strategy for mining

    From the first study to mine closure: feasibility, permitting, operations, compliance, critical situations and closure.

    Request the presentation
  • Real estate development

    Environmental strategy for real estate development

    Acquisition, design, approval and construction: what comes with the land and how it enters the decision.

    Request the presentation

Contact

Is there a permit to obtain, renew or defend?

The first conversation is with the person who will lead the work.

Henrique Marizhenrique@hmariz.comWhatsApp (31) 99791-8003Belo Horizonte, Minas Gerais